WIP: Export bounded depot telemetry over OTLP/HTTP #44

Closed
forge wants to merge 1 commit from v1-otel-20260923 into v1-release-pipeline-20260923
First-time contributor

Implements #29. pkg6depotd exports OTLP/HTTP protobuf traces, metrics, and logs through bounded per-signal queues that evict the oldest record. Collector failures and retries stay off the request path; shutdown honors its configured deadline. The packaged KDL sample and pkg6depotd(8) document the operator interface.

Validation: 51 depot tests pass, including mock collector, overflow, permanent rejection, proxy, SIGTERM, and slow final metrics flush cases. Local cargo fmt and targeted clippy pass; native illumos and combined integration remain pending. This PR stacks on #43 and remains WIP until the integrated release candidate is tested.

Implements #29. pkg6depotd exports OTLP/HTTP protobuf traces, metrics, and logs through bounded per-signal queues that evict the oldest record. Collector failures and retries stay off the request path; shutdown honors its configured deadline. The packaged KDL sample and pkg6depotd(8) document the operator interface. Validation: 51 depot tests pass, including mock collector, overflow, permanent rejection, proxy, SIGTERM, and slow final metrics flush cases. Local cargo fmt and targeted clippy pass; native illumos and combined integration remain pending. This PR stacks on #43 and remains WIP until the integrated release candidate is tested.
Export depot telemetry over bounded OTLP HTTP
Some checks failed
CI / illumos (OpenIndiana) build + nextest (pull_request) Successful in 6m0s
CI / Linux (fmt / clippy / nextest / e2e / docs) (pull_request) Failing after 31m40s
9dd36eb69f
Owner

Superseded by #54, which brings the whole RC13 line (feat/historical-import, a strict superset of v1-integration-20260923) to main in one pull request, as decided in ADR-015 item 6. Nothing from this branch is lost; closing to keep one integration path.

Superseded by #54, which brings the whole RC13 line (`feat/historical-import`, a strict superset of `v1-integration-20260923`) to `main` in one pull request, as decided in ADR-015 item 6. Nothing from this branch is lost; closing to keep one integration path.
toasterson closed this pull request 2026-09-27 13:12:42 +00:00
Some checks failed
CI / illumos (OpenIndiana) build + nextest (pull_request) Successful in 6m0s
CI / Linux (fmt / clippy / nextest / e2e / docs) (pull_request) Failing after 31m40s

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
OpenIndiana/ips!44
No description provided.