docs(lilith): RESULT for program r3 (shadow work) acceptance — NOT CERTIFIED #550

Open
toasterson wants to merge 1 commit from docs/lilith-program-r3-result into main
Owner

Acceptance RESULT for lilith-program-r3-20261005 (plan 2026-10-04, go 2026-10-05): candidate adapter d8a8ff33…, 292 steps from the r2 candidate, exam frozen on the full sealed window with the launch-exam held-out seeds, decontamination clean.

Verdict: NOT CERTIFIED, 99 blockers (38 underpowered families, 10 not evaluated, the rest substantive).

Moved: blinded panel 37 pass / 44 fail vs the frozen parent's 4 / 100 (run 2: 15 vs 2); dojo mean 0.374 (run 2: 0.284) vs parent 0.458; better than the parent on read-failure, park-triage, receipts, action-item, five sparring adversaries and five katas; fabrications 15 vs the parent's 44.

Did not move: commitment on_time 0.321 vs 0.551 (the one powered regression); landed-claim 0/3; care hard constraint 3/6 missed risk turns (the deflection turn); katas 12/32 with the costume register (German 1/11); captain-selection reason 1/4.

Why the shadow work under-delivered, recorded honestly: a hand-off race kept the 21 Green teacher siblings out of training, and 20 of them (and 5 of 10 Brown) were unfit for the 16k training context anyway; the trainer rejects multi-turn sibling preference pairs. Open hypotheses 1–3 address exactly that. Incidents, cost ($17.29 on Runpod for the run, credit $1.81 left) and retained artifacts are in the document. Private paths scrubbed; the candidate stays inactive.

Acceptance RESULT for `lilith-program-r3-20261005` (plan 2026-10-04, go 2026-10-05): candidate adapter `d8a8ff33…`, 292 steps from the r2 candidate, exam frozen on the full sealed window with the launch-exam held-out seeds, decontamination clean. **Verdict: NOT CERTIFIED, 99 blockers** (38 underpowered families, 10 not evaluated, the rest substantive). **Moved:** blinded panel 37 pass / 44 fail vs the frozen parent's 4 / 100 (run 2: 15 vs 2); dojo mean 0.374 (run 2: 0.284) vs parent 0.458; better than the parent on read-failure, park-triage, receipts, action-item, five sparring adversaries and five katas; fabrications 15 vs the parent's 44. **Did not move:** commitment on_time 0.321 vs 0.551 (the one powered regression); landed-claim 0/3; care hard constraint 3/6 missed risk turns (the deflection turn); katas 12/32 with the costume register (German 1/11); captain-selection reason 1/4. **Why the shadow work under-delivered, recorded honestly:** a hand-off race kept the 21 Green teacher siblings out of training, and 20 of them (and 5 of 10 Brown) were unfit for the 16k training context anyway; the trainer rejects multi-turn sibling preference pairs. Open hypotheses 1–3 address exactly that. Incidents, cost ($17.29 on Runpod for the run, credit $1.81 left) and retained artifacts are in the document. Private paths scrubbed; the candidate stays inactive.
docs(lilith): RESULT for program r3 (shadow work, White→Black) acceptance — NOT CERTIFIED
All checks were successful
CI / test-sokar (pull_request) Successful in 7m37s
CI / docker-seshd (pull_request) Successful in 11m23s
CI / docker-akh-transcripts (pull_request) Successful in 12m13s
CI / test-akh-medu (pull_request) Successful in 20m53s
CI / check-seshat (pull_request) Successful in 22m17s
CI / publish-chart (pull_request) Successful in 14m36s
CI / check-akh-medu (pull_request) Successful in 30m42s
CI / docker-sokard (pull_request) Successful in 28m6s
CI / test-session-platform (pull_request) Successful in 48m50s
CI / platform-images-daemons (pull_request) Successful in 3m4s
CI / platform-images-home (pull_request) Successful in 4m23s
CI / platform-images-fleet (pull_request) Successful in 3m9s
CI / platform-images-core (pull_request) Successful in 7m33s
CI / platform-images-collect (pull_request) Successful in 1m4s
324ebb9873
99 blockers. Candidate dojo mean 0.374 (r2 0.284) vs parent 0.458; blinded
panel 37/81 pass vs parent 4/104; fabrications 15 vs 44; commitment on_time
regression (Δ -0.231); care 3/6 missed risk turns; katas 12/32. Most teacher
siblings were unfit for the 16k training context and a hand-off race kept the
Green siblings out of training; both recorded with the other incidents.
All checks were successful
CI / test-sokar (pull_request) Successful in 7m37s
CI / docker-seshd (pull_request) Successful in 11m23s
CI / docker-akh-transcripts (pull_request) Successful in 12m13s
CI / test-akh-medu (pull_request) Successful in 20m53s
CI / check-seshat (pull_request) Successful in 22m17s
CI / publish-chart (pull_request) Successful in 14m36s
CI / check-akh-medu (pull_request) Successful in 30m42s
CI / docker-sokard (pull_request) Successful in 28m6s
CI / test-session-platform (pull_request) Successful in 48m50s
CI / platform-images-daemons (pull_request) Successful in 3m4s
CI / platform-images-home (pull_request) Successful in 4m23s
CI / platform-images-fleet (pull_request) Successful in 3m9s
CI / platform-images-core (pull_request) Successful in 7m33s
CI / platform-images-collect (pull_request) Successful in 1m4s
This pull request can be merged automatically.
This branch is out-of-date with the base branch
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin docs/lilith-program-r3-result:docs/lilith-program-r3-result
git switch docs/lilith-program-r3-result

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff docs/lilith-program-r3-result
git switch docs/lilith-program-r3-result
git rebase main
git switch main
git merge --ff-only docs/lilith-program-r3-result
git switch docs/lilith-program-r3-result
git rebase main
git switch main
git merge --no-ff docs/lilith-program-r3-result
git switch main
git merge --squash docs/lilith-program-r3-result
git switch main
git merge --ff-only docs/lilith-program-r3-result
git switch main
git merge docs/lilith-program-r3-result
git push origin main
Sign in to join this conversation.
No reviewers
No labels
follow-up
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
toasterson/akh-medu!550
No description provided.